Why it matters

Cyanide needs its equipment ready

HCN monitors, safety showers and the cyanide first aid kit must be working and in date every shift, not found out of date on the day.

The tailings dam is watched

Freeboard, seepage and the embankment are inspected on the frequency the tailings management plan sets, with photographs from the same points each time.

Fixed plant runs all day

Crushers, screens and conveyors carry guards, stops and pull-wires that must work before the first start.

What Escudo Mining does

For processing plants

  • Crusher and screen daily checks, conveyor shift checks and conveyor fire protection
  • A cyanide and CIL area inspection each shift, and a reagent store inspection
  • A tailings storage facility as a place with a QR tag: the routine inspection, freeboard and pond readings, photo points and defects
  • A dam break evacuation drill in the drill library, with the steps your emergency plan sets
  • Hazardous chemicals register with safety data sheets, spill kits and the site’s emergency equipment

Plant checks in the starter library

  • Crusher daily check
  • Screen daily check
  • Conveyor shift check
  • Cyanide and CIL area inspection
  • Reagent store inspection
  • Tailings storage facility inspection
  • Hazardous chemical store inspection
  • Cyanide exposure kit check

Starting points to adapt. Limits are never set for you: your site enters its own from the maker and its procedures.

Checklists for processing plants

Starter checklists to read and print, item by item. No limit is written in: your people set their own.

See it at your own site

Send us your refuge chamber inspection and your breathing apparatus checks. We will set up a mine site with your rule pack and show you the readiness board working.

Or email us: info@escudoready.com