Skip to content
Book a demo

Why it matters

Refuge chambers are the plan

A chamber missing its inspection or short of supplies changes what the emergency plan can rely on.

Explosives underground

Magazines and charge-up units need their ledger, inspections and quantities kept every shift.

A big underground fleet

Loaders, trucks, drills and charge-up units each need a pre-start the operator will actually do.

What Escudo Mining does

For underground metalliferous

  • Refuge chambers, caches and first aid rooms with their own QR tag, checks, defects and status
  • An explosives ledger per magazine with the balance after each entry, stocktakes, blast records and misfires
  • Breathing apparatus, self-rescuers and gas detection by location, with their test regimes
  • Plant quarantine and fire records, and work orders to site maintenance
  • The responder site pack, printed or saved on the phone

Plant checks in the starter library

  • LHD loader pre-start
  • Underground truck pre-start
  • Jumbo or production drill pre-start
  • Underground charge-up unit pre-start
  • Integrated tool carrier or EWP pre-start
  • Underground light vehicle or personnel carrier pre-start

Starting points to adapt. Limits are never set for you: your site enters its own from the maker and its procedures.

See it at your own site

Send us your refuge chamber inspection and your breathing apparatus checks. We will set up a mine site with your rule pack and show you the readiness board working.

Or email us: info@escudoready.com