Skip to content
Book a demo
Suits
Mining plant
Items
16, in 3 sections

Lights and alarms

  1. Warning beacons and lights operationalPass or fail · photo every timeSwitch on every beacon and warning light. Photograph them running. None cracked or missing.
  2. Siren or horn operationalPass or failThe horn, or the siren where fitted. Clearly heard outside the machine.
  3. Reversing or travel alarm soundsPass or fail
  4. Headlights and work lightsPass or fail

Machine

  1. Tyres, rims and wheel nuts: no damage or heat marksPass or failCuts, bulges, missing or loose wheel nuts, and heat marks or blistering on the tyre or rim. Photograph any damage. A tyre exposed to heat or fire goes to the tyre quarantine record.
  2. Service and park brakes holdPass or fail · out of service if it fails
  3. Steering responds, no excess playPass or fail · out of service if it fails
  4. Articulation joint and pins: no cracks or playPass or fail
  5. Bucket, linkage and pins: no cracks, pins keptPass or fail
  6. Cab electrics, gauges and controls workPass or fail
  7. Hydraulic hoses and fittings: no leaks or rubbingPass or fail
  8. Seat belt latches and retractsPass or fail
  9. Engine oil, coolant and hydraulic oil levelsPass or fail · out of service if it fails
  10. Fire suppression check done, system healthyPass or failFrom the fire suppression operator check. Stands in for a link to that record. A fault restricts the machine until it is fixed.
  11. Fire extinguisher service tagExpiry dateEnter the date on the tag or label. Warns 30 days before.

Readings

  1. Engine hoursEngine hours: recorded, and checked for plausibility · photo every timePhotograph the hour meter with the reading clear.

Checked by ______________________   Date and time ______________   Unit ______________

A starting point: change the items to match your procedure before you rely on them.

How it differs from the LHD loader and underground truck pre-start

12 of its 16 items are the same on both. This one adds service and park brakes hold, bucket, linkage and pins: no cracks, pins kept, cab electrics, gauges and controls work and hydraulic hoses and fittings: no leaks or rubbing. It leaves out hoses near the fan and turbo: no leaks or rubbing, bucket, lift arms and pins: no cracks, pins kept, brake test on a decline, or park brake holds, tele-remote system and its stops work, self-rescuer on board for the operator and 1 more.

What this checklist asks for

Takes the unit out of service

As the starter is set, a fail on any of these takes the unit out of service until the defect is cleared. You can change what any item does.

  • Service and park brakes hold
  • Steering responds, no excess play
  • Engine oil, coolant and hydraulic oil levels

Meter readings

A meter reading never fails the check. It is refused if it goes backwards, and flagged for an officer if it jumps further than the limit your organisation sets.

  • Engine hours

Needs a photo every time

Taken live on the phone and kept with the answer.

  • Warning beacons and lights operational
  • Engine hours

Questions about this checklist

What does the wheel loader pre-start checklist cover?

16 items in 3 sections: lights and alarms, machine and readings.

What happens when an item fails in Escudo Mining?

As the starter is set: 3 items take the unit out of service and 12 items restrict it when they fail; the rest are recorded. You can change what any item does. A failure asks for a photo on 13 items, and the defect goes to the people who fix it.

Is anything on the wheel loader pre-start measured against a limit?

No item takes a limit. Engine hours is recorded every time with no limit to set. A meter reading never fails the check. It is refused if it goes backwards, and flagged for an officer if it jumps further than the limit your organisation sets.

Run it on the phone instead of paper

Open it from the unit’s tag, with or without signal. A failed item becomes a defect with a photo and sets the status as your template says.

Read more from Safe Work Australia. Escudo Ready is independent, and this checklist is a starting point of ours, not a requirement of theirs.

Send us your own version of this check

We will build it into Escudo Mining with your items and your rule pack, and show it running on a phone underground with no signal.

Or email us: info@escudoready.com