Skip to content
Ask for an early trial
Suits
Elevating work platform
When
Before use
Items
19, in 5 sections

Cab

  1. Hour meterEngine hours: recorded, and checked for plausibility · photo every timePhotograph the hour meter with the reading clear.
  2. Fuel levelFuel gauge, in eighths: recorded, never failsRead the gauge to the nearest eighth.
  3. Seat and seat belt soundPass or fail
  4. Horn worksPass or fail

Platform and boom

  1. Quick coupler locked, pins engagedPass or fail · off road if it fails
  2. Basket controls and emergency lowering workPass or fail · off road if it fails
  3. Platform, gate and rails: no damage, gate closesPass or fail
  4. Load chart on the machine matches the attachmentPass or fail
  5. Hydraulic hoses and cylinders: no leaksPass or fail

Running checks

  1. Emergency stops work at ground and platformPass or fail · off road if it fails
  2. Tyres: no damage, wheel nuts tightPass or fail · a defect here can never be deferred
  3. Service brake and park brake holdPass or fail · a defect here can never be deferred
  4. Flashing light and travel alarm workPass or fail
  5. Headlights and work lights workPass or fail
  6. Fire suppression check done, system healthyPass or failA fault restricts the machine until it is fixed. Where a system is fitted. Remove this item where it does not apply.

Compliance

  1. Operator manual and logbook on the machinePass or fail
  2. EWP annual inspectionExpiry dateEnter the date on the tag or label. Warns 30 days before.
  3. Operator licence or ticket carriedPass or fail

Leaks

  1. Engine oil, coolant and hydraulic oil levelsPass or fail · off road if it fails

Checked by ______________________   Date and time ______________   Vehicle ______________

A starting point: change the items to match your procedure before you rely on them.

How it differs from the boom lift pre-start

11 of its 19 items are the same on both. This one adds seat and seat belt sound, horn works, quick coupler locked, pins engaged, basket controls and emergency lowering work, load chart on the machine matches the attachment and 3 more. It leaves out safety signs and safe working load plate readable, boom, jib and pins: no cracks, keepers in place, harness and lanyard sound, anchor point sound, emergency lowering works, tilt alarm sounds and cuts out on a slope and 5 more.

What this checklist asks for

Never deferrable

A defect from brakes, steering, suspension, tyres, couplings and wheel nuts stays open until it is repaired and cleared.

  • Tyres: no damage, wheel nuts tight
  • Service brake and park brake hold

Meter readings

A meter reading never fails the check. It is refused if it goes backwards, and flagged for an officer if it jumps further than the limit your organisation sets. A fuel level never fails the check. It is recorded in eighths.

  • Hour meter
  • Fuel level

Needs a photo every time

Taken live on the phone and kept with the answer.

  • Hour meter

Questions about this checklist

What does the integrated tool carrier or EWP pre-start checklist cover?

19 items in 5 sections: cab, platform and boom, running checks, compliance and leaks.

What happens when an item fails in Escudo Fleet?

As the starter is set: 5 items take the vehicle off road and 10 items restrict it when they fail; the rest are recorded. You can change what any item does. A failure asks for a photo on 16 items, and the defect goes to the people who fix it. 2 items are safety critical, so a defect from them can never be deferred.

Is anything on the integrated tool carrier or EWP pre-start measured against a limit?

No item takes a limit. Hour meter is recorded every time with no limit to set. A meter reading never fails the check. It is refused if it goes backwards, and flagged for an officer if it jumps further than the limit your organisation sets. A fuel level never fails the check. It is recorded in eighths.

Run it on the phone instead of paper

Open it from the vehicle’s tag, with or without signal. A failed item becomes a defect with a photo and sets the status as your template says.

Read more from Safe Work Australia. Escudo Ready is independent, and this checklist is a starting point of ours, not a requirement of theirs.

Start from this checklist

Pick your industry and this template is installed with the others, ready to change into your own words and run on the phone.