Skip to content
Book a demo
All Aviation walkthroughs
Airport walkthrough

One airport’s day, from the first inspection to the packs.

The aerodrome, the ground handling and the rescue and firefighting service, told as one day in 28 films. Each step opens its film, where the operator’s phone and the dashboard play together, chapter by chapter.

AerodromeAerodromes, remote strips and landing sites15 films, 79 chaptersThe serviceability board from your records: setup and rule packs, inspections, lights out and the NOTAM log, runway condition, works, obstacles, wildlife, the inspector pack and the emergency exercise.Watch the aerodrome films
GSEGround support equipment7 films, 36 chaptersUnits against the day’s flights: turn profiles and the import, pre-use checks by tag, red tags and lockouts, permits and notices, statutory items, helicopter equipment and the station pack.Watch the GSE films
ARFFARFF Ready6 films, 35 chaptersThe category board from the appliance checks: crew to category, foam and agents, incidents, drills and response times, and the readiness pack with sealed records.Watch the ARFF films

Illustrated from the real operator app and dashboard. The aerodrome and ground handling films are set at Harbourview Regional Airport and the ARFF films at Eastvale Regional Airport; their own dates run from 20 October to 4 November. Each team keeps its own records and decisions: Escudo Aviation never issues a NOTAM, never declares an aerodrome safe, never declares a category, never approves a lifting device and never certifies anyone as trained. Both airports and everyone in the films are invented.

Before the day

  1. 20 OctAerodrome
    Setting up the site

    The manager picks the rule pack, numbers the runway edge lights 1 to 24 and records the last technical inspection.

  2. The day beforeGSE
    Turn profiles and the flights import

    The airline adds a Dash 8 service with no turn profile: one is set by hand, and tomorrow’s schedule imported with every row checked.

The day

  1. 04:30GSE
    Flights to the first shortfall

    The flights become demand, pre-use checks run from START and PROOF tags, a missing bumper red-tags a belt loader, and 06:00 is short by 1.

  2. 04:40Aerodrome
    Before the first departure

    The reporting officer logs today’s movements and runs the safety-critical inspection on the phone: 1 of 1 done before the 06:10 departure.

  3. 05:10Aerodrome
    Two lights out

    Lights 11 and 12 go out side by side, so the circuit is Restricted, a NOTAM is required and the supervisor acknowledges the change.

  4. 05:20Aerodrome
    The NOTAM log

    The NOTAM is raised the aerodrome’s usual way, and Escudo records the request, the number and the review on the phone.

  5. 06:20GSE
    At the stand

    The turn set at stand 4 is checked, a tug touches a cargo door, and the lockout holds until an inspection lifts it.

  6. 06:55ARFF
    Crew to category

    T. Brooks signs on to TENDER 1 with a competency out of date, the crew rule drops the category, and a drill renews it.

  7. 07:14ARFF
    Daily check to category

    The major foam tender’s daily check at the pump panel, with a flickering locker light and no signal in the bay, still counts on the board.

  8. 07:30Aerodrome
    Rain and the runway condition report

    The wet runway is reported third by third, two MEDIUM braking reports prompt a slippery wet report, and by 09:50 it is dry.

  9. 07:41ARFF
    When the category drops

    A pump that will not engage, category 5 with the cause, alerts that escalate, the NOTAM reference and the category restored.

  10. 09:00ARFF
    Foam and agents

    TENDER 2’s induction test measures 2.4% instead of 3%, it is restricted until the retest passes, and every litre stays on the record.

  11. 09:30Aerodrome
    Lights fixed

    The lamps are replaced, the circuit is Serviceable again, and the NOTAM is cancelled the usual way and recorded as cancelled.

  12. 09:55Aerodrome
    Works and the restore countdown

    The works safety officer is briefed and starts with a photo, restores the taxiway before the 10:40 movement, and resumes after it.

  13. 10:00GSE
    Permits, authorities and notices

    A permit expiring, a driver with no airside driving authority for the apron, and an airport defect notice closed out.

  14. 10:40ARFF
    Incidents, drills and response times

    A full emergency from call to stand-down, the agent each appliance used, replenishment and a response-time drill.

  15. 11:50Aerodrome
    Handback and the inspection

    The taxiway is handed back with an end photo beside the start photo, and stays Restricted until the next inspection meets it.

  16. 13:00Aerodrome
    A planned closure

    Planned the day before, the runway closes for line marking with no alarm, the manager’s own state beside it, and is Open again at 15:00.

  17. 13:30Aerodrome
    A bird strike

    Galahs are moved off the runway, then a strike on landing gets the 72-hour reminder until the report is recorded; Escudo never lodges it.

  18. 16:00ARFF
    Insights and the readiness pack

    ARFF insights, the readiness pack with its SHA-256, the CSV download and sealed check records with a verified chain.

  19. 16:50Aerodrome
    The inspector pack in full

    The findings map, then one pack with every section an aerodrome inspector asks for and a SHA-256 to check the download.

The days after, and the other sites

  1. 30 OctAerodrome
    A crane and an unplanned inspection

    A crane restricts the board and nobody acknowledges for 15 minutes, so managers are alerted; later a pilot’s debris report raises an inspection.

  2. 30 OctGSE
    A new unit, the EWP switch and an override

    Out of service until the load test interval is set, the certificate recorded, the EWP switch and a credential override.

  3. 29 to 31 OctGSE
    Statutory items and the station pack

    Statutory items coming due, a certificate recorded and a wrong one voided, and the month-end station pack.

  4. 31 OctGSE
    Helicopter ground handling

    The wheels check from the START tag, and a frayed strap that quarantines the tie-down kit.

  5. 4 NovAerodrome
    The emergency exercise

    The full-scale exercise from the library is run on the phone, a gap becomes a corrective action, everyone signs, and the drill pack is made.

  6. Any dayAerodrome
    A remote strip

    The owner reports the strip ready by day only, records who was told and lays the night kit before a night task. The pilot decides.

  7. Any dayAerodrome
    A hospital landing site

    The pad is inspected daily and before each movement, and when it closes for repairs, who was told is on record.

One record, three boards

Aerodrome boardEach site Open (from records), Open with restrictions or Closed (from records), with the operator’s own state beside it.
GSE boardEach station Covered (from records), Tight or Short (forecast), hour by hour against the flights.
ARFF categoryThe category each site can meet now against its rules table, beside the declared category.
Drills and exercisesThe aerodrome, apron and ARFF drills in your plans, with your intervals, runs, signatures and the drill pack.

Records only. Each board shows what your records say; the decisions stay with your reporting officers, supervisors, aerodrome manager, ARFF service and the pilots. The drill library.

Put one airport on the boards

Send us your serviceability inspection, a GSE pre-use check and your appliance check. We will set up the site and show you the boards working.