A record board for every tail, from the entries you already make
Open deferrals and their intervals, findings without a tech log reference, the daily inspection, emergency equipment, documents, the due list from your tracker, hoist and role records, and your declared standby beside them. Records only: the decisions stay in the technical log.
Records clear, Clear with deferrals, Not clear, Not set
The words describe your records, never the aircraft. Each reason names the record as entered, and the board shows when it was last synced. It never says released, airworthy, serviceable or go.
Under every board: “Shows the operator’s own records. Release to service and deferral decisions are made by authorised persons in the technical log.”
- Four words, from your own entries
- Each tail is Records clear, Clear with deferrals (with the nearest expiry), Not clear (naming the record that is missing or past its date, as entered) or Not set. The station shows its worst tail, with a count of each.
- Eight lanes
- Deferrals, findings and tech log references, the required inspection, emergency equipment and the ELT, aircraft documents, reports and notices, the due list as imported, and hoist and role records.
- Events to acknowledge
- A deferral ending within 24 hours or past its interval, an extension notice due, an ELT near its removal limit, equipment or a document due, a report to make, no daily inspection by the first departure, a due line inside the margin or past its limit, and a tail declared not ready for standby. Each is acknowledged on the board, and escalates if nobody does.
- On every phone that opens the tail
- The words and reasons are saved on the phone with the time, so a deferral past its interval or a missing daily shows with no signal.
Each deferral as entered, with its clock per the entry
- The clock, per the entry
- The discovery day from the tech log or maintenance release, and the expiry at the end of that day plus the interval, in local time or UTC as the MEL states: “day 6 of 10, ends 3 Nov 00:00 local per the entry”. Category A as a typed limit in days, flight days, flights or hours. With no tech log date the tail shows Not clear.
- Who enters it
- Only people the operator records with an authority to defer for that market see Enter deferral. Anyone else makes a transcribed entry with a photo of the signed tech log or release entry. Every entry keeps the licence or authorisation number, the date and where it is signed.
- Placards
- The placard photo with each deferral, and a reminder on the phone while none is recorded.
- One extension and the notice
- One extension with its approval fields, where the pack allows it. Under the Australian pack the CAMO’s extension is notified to CASA within 10 days, and the board reminds until the notice is recorded. Escudo does not send it.
- Tech log references
- Every finding carries its tech log page and entry, or a CAR 1988 maintenance release serial and endorsement. A finding with neither and no deferral makes the tail Not clear.
- ELT removed for maintenance
- Make, model, serial, the date removed and the reason, as Part 91 MOS 26.52 asks, with the placard “Emergency locator transmitter not installed or carried” confirmed and photographed. Up to 90 days, and only for an aircraft not required to carry a life raft.
Escudo never defers or extends anything: the entry in the technical log or maintenance release is the deferral, and Escudo records it. Reports the operator must make, such as a major defect report within 2 days under Part 42, are recorded with their reference. Escudo never files them.
What is due, as your tracker says, and what was flown since
- Due items by import
- Your tracker holds the due list. You import its export onto Escudo’s CSV template with the source, the time of the export and the airframe totals, and each line shows “due in 8.7 hours per the import of 29 Oct 2026”. Lines inside your warning margins show amber; a line past its limit per the import makes the tail Not clear. An import older than the days you set is flagged.
- Utilisation per flight
- Airframe hours, cycles, landings, APU hours, and hoist cycles and lifts for each flight, from the crew app, the dashboard or the tech log. Between imports the remaining is estimated from the utilisation since, and labelled estimated.
- Variations from the logbook
- The New Zealand 10% planning latitude and the Part 42 MOS 2.10 one-off extension, with the logbook reference and who agreed it, where the aircraft’s packs allow them.
- Hoists and cables
- Each hoist with its cable and the limits from the maker’s data or an AD, in cycles, lifts, hours or a date, counted with the utilisation recorded. A cable change is a removal and a new record.
- Role records
- Hoist inspections, NVG checks, NVIS lighting assessments, HUMS checks or downloads and airframe washes, each with its next due date as entered.
- The standby, declared by you
- For HEMS, SAR and police air wings: the operator declares a tail ready, ready with limits or not ready for a role and period. It shows beside the record words as the operator’s declared readiness, never instead of them. Escudo never works it out.
Escudo is never the maintenance source of truth. It never works out a due point and never sets an interval or a limit: they come from your tracker, the MEL, the maker’s data, the AD or your programme, as entered.
By market, named by what they contain
- Australia: Part 91 MOS chapter 28 (MEL) and 26.52 (ELT)
- Australia: CASR Part 42 (deferral, major defect report, records)
- Australia: CAR 1988 Part 4A (maintenance release, daily inspection)
- Australia: CAR 1988 Part 4B (defect reports)
- New Zealand and Papua New Guinea: Part 91 and Part 43
- Hong Kong: CAD 549 (MEL) (to confirm)
- Malaysia: CAD 6801 (continuing airworthiness) (to confirm)
- Singapore: ANR-91 and ANR-121 (MEL) (to confirm)
- Fiji: CAAF SD-ICAT (MEL) (to confirm)
The Australian packs read Part 91 MOS Compilation 8 (Category B 3 days, C 10, D 120). Outside Australia and Hong Kong the intervals come only from the operator’s MEL. Packs marked to confirm are confirmed with each customer first.
- Documents aboard: 13 items, before the first flight
- Emergency equipment: 14 items, monthly and when equipment changes
- Cabin before the first flight: 9 items, before the first flight of the day
- After last flight: 10 items, after the last flight of the day
- Aircraft in storage: 10 items, when the aircraft is stored
Beside the walk-arounds by aircraft type. Each is copied in as a draft, changed to your own procedures and published.
The walk-around, what went into the tanks and the reference in use
- Walk-arounds by aircraft type
- Pre-flight, turnaround, final and arrival walk-arounds by aircraft type and the pilot-performed daily inspection, copied in from the catalogue as drafts and published in your own words. Each item’s photo is taken from the viewpoint the template names, the check is sealed, and the one you choose is counted as the required inspection, against the first departure of the day or each flight.
- Fuel uplifts
- Grade, litres, kilograms and density as on the docket, the supplier, docket number and photo, and the supplying unit or site, scanned by its tag or picked. That day’s fuel quality check on the unit or site is linked where one is recorded; none recorded is a note, never a block.
- Weight and balance reference
- The reference from the weighing report or approved document, its date, the empty weight and arms as entered and the document, superseded by a newer one. Never a calculation.
Escudo never works out a weight, an arm, a moment or a loading, and never converts litres and kilograms: each figure is as on the docket or the document.
What Escudo Aviation never does
- Release an aircraft to service or make an airworthiness decision: authorised persons do, in the technical log
- Defer or extend anything: the entry in the technical log or maintenance release is the deferral, and Escudo records it
- Offer Enter deferral to anyone the operator has not recorded with an authority
- Work out a due point: the operator’s tracker holds the due list, and Escudo shows the import and the utilisation since
- Set an interval or a limit: they come from the MEL, the maker’s data, the AD or the operator’s programme, as entered
- Work out the standby readiness: the operator declares it, and it never changes the record words
- File a report or send an extension notice: it reminds, and records the date and reference
- Work out a weight, an arm, a moment or a loading, or convert litres and kilograms
- Say released, airworthy, serviceable or go about an aircraft
Certifying staff, qualified individuals, the CAMO and the pilot in command keep every decision. Watch the aircraft records walkthrough.
Start with one tail
Send us your MEL categories, your tracker’s export and the people who hold an authority to defer. We set up the aircraft and your engineers and pilots start the next morning.