All checksMarine rescue · Checklist
IRB pre-launch check
Before every launch of an inflatable rescue boat: signals, hull and valves, the outboard and kill switch, fuel at the unit’s minimum, radio and the gear aboard.
- Items
- 14, in 5 sections
Signals
- Navigation lights operationalPass or fail · photo every timeSidelights, sternlight and masthead or all-round white light for the vessel’s length (COLREG Rule 22). Photograph them on. A craft never used between sunset and sunrise records that in its operating limits.
- Sound signal operationalPass or failA whistle or horn from 12 m, with a bell as well from 20 m; another efficient sound signal under 12 m (COLREG Rule 33).
Hull
- Hull and pontoons firm, no leaksPass or fail · off run if it fails
- Valves closed and cappedPass or fail · off run if it fails
- Floor, keel and transom soundPass or fail
Outboard
- Outboard mounted and safety line onPass or fail · off run if it fails
- Kill switch stops the motorPass or fail · off run if it failsStart the motor, pull the kill cord. It must stop straight away.
- Propeller and guard undamagedPass or fail · off run if it fails
- Fuel at or above the unit’s minimumPass or failPass or fail only. No fuel quantity is recorded.
Gear aboard
- Handheld VHF test call madePass or fail
- Spare kill cord aboardPass or fail
- Crew lifejacketsCount against your par level
- Crew helmetsCount against your par level
Service dates
- Outboard serviceExpiry dateEnter the date on the tag or label. Warns 30 days before.
Checked by ______________________ Date and time ______________ Vehicle ______________
No limit is shown here on purpose: set each from the maker’s manual or your own procedure. A starting point: change the items to match your procedure before you rely on them.
Send us your own version of this check
We will build it into Escudo Emergency with your items and wording, and show it running on a phone with the defects and status it produces.
Or email us: info@escudoready.com